For all those wondering what is going on, my computer that I download photos and do movies broke and I haven't had time to fix it. We listed the house Monday for $289,900. Here is a link to the online sales page:
http://www.cbburnet.com/CustomModules/Property/PropertyDetail.aspx?SearchID=7825945&PropertyGUID=FB8CF246-EE52-4393-8683-A9A16A8C5B42&TotalRows=90&CurrentPage=56&SortValue=0&LastResultsPage=6&IsSold=False
It looks like you might have to copy and paste the above url, if it doesn't show as a link.
I might get more pictures in the future and I'll keep this updated if we get any offers/sales
Thursday, August 14, 2008
Thursday, July 24, 2008
Party at the Flipper Aug. 1st, 4pm-?
We made it!!!!
Friday August 1st, Sheila and I are having a party at the flipper, everyone is welcome. Come check out what Sheila and I have been up to, and see the place in real life. We'll have beverages and appetizers.
17264 Sunray Circle Sw
Prior lake, MN 55372
Cell# 612-269-5066
Friday August 1st, Sheila and I are having a party at the flipper, everyone is welcome. Come check out what Sheila and I have been up to, and see the place in real life. We'll have beverages and appetizers.
17264 Sunray Circle Sw
Prior lake, MN 55372
Cell# 612-269-5066
Wednesday, July 16, 2008
The Final stretch


Our Computer broke down, so I don't know when I'll get pictures or video going. Sheila is busy doing shopping for staging and finishing the door knobs and the closets. I am working on getting the porch up to speed. Last night was a short night with a little buying trip and then I finished the wiring in the porch. I figured about 50 hours left for me to get this thing done. We still need to do some painting on the outside and sheetrock the porch and installing siding on the outside of the porch. The last of the carpet is being scheduled today and hopefully layed in the next week. After that we should have the final cleaning and on the market.
I Can't Wait!!!!!!
Saturday, June 28, 2008
Getting very close
We still have some work to do, but we are getting close to being finished. The fireplace is all trimmed and tiled, just needs grout. The kitchen needs the under cabinet lighting and some trim. The bar downstairs is tiled and needs grout. Still need to do the sheet rock and painting around the bar area. The basement bedroom and storage space will be getting carpet when the sun room is finished, hopefully start this week on the sun room. I've been so busy working that I haven't been taking much video or photo's, also it's to the point I'd rather just take the final photo's for everyone to see. At the end of the video is Brad Doerr, Evan, Clay, Sheila and Liz Thomford.
Sunday, June 8, 2008
Boys working at the Flipper
We had Brad help with the installation of the front window, and Evan and Clay hauled the wood flooring over and help get rid of the dirt pile.
Tuesday, June 3, 2008
Update
I'm gonna say that I haven't updated the blog, because we've been to busy to blog. Sheila and I have been putting in more time lately trying to get done by the end of June. The carpet should be installed in less then 2 weeks and then we can get the wood floor in. Except for the Kitchen, almost the whole upstairs (minus the flooring) is ready. We have been doing a lot of work outside now that the weather is nice. I was telling Sheila yesterday that I don't feel like I get much done, but then you look at what I did in 4 hours yesterday, I guess I did. I installed the ceiling fan in the master bedroom, finished the trim in the master bathroom, bedroom, main bath. Installed the small window in the garage. Not in order, but I moved about 2 yards of dirt around for Sheila' planter and low spots. Chain-sawed some of the front pine tree, Oak tree and Maple tree in the back. I'm sure there were some other misc. things. So stuff is getting done, but a little here, a little there. I told Sheila last night, I'd like to go room by room and get them finished so I can say that room is all done!!!!!
Wednesday, May 14, 2008
Walls, doors, paint
Subscribe to:
Posts (Atom)

