Wednesday, January 2, 2008

Week 5 thru New years day




It's been a very busy week for us, but the pictures and video don't show it. We had to almost rewire the whole Kitchen because the wires were going to the wrong places, like the new oven, or were not buried in the walls. The cellulose insulation was a hassle to work with as we were taking down the soffits in the Kitchen and then putting up new recessed lighting. We insulated below the floor on the outside walls and insulated what we could in the ceiling. The flooring is all level now, there were holes and drop outs where the cabinets were. The ceiling is now sheetrocked and we are ready to vapor barrier and install the wall sheetrock. Still waiting for another furnace bid. We have many of the faucets being shipped in as I write and Sheila picked up the tile for the main bathroom. The rolloff is almost full! To give you perspective it is about 6' tall and about 20' long and it's packed. We'll still have to haul 1 or 2 horse trailers full of stuff to the dump.